Key Metrics

MetricValue
CompanyPipeChina Group Tianjin LNG Co., Ltd.
Telephone022-25608122
Registered capital321,025.37 (10,000 yuan)
Registered address1-1-1822, South Zone, Financial Trade Center, No. 6975 Asia Road, Dongjiang Bonded Port Area, Tianjin Pilot Free Trade Zone
SiteDongjiang Bonded Port Area, Tianjin Pilot Free Trade Zone
Key facilities4 x 160,000 m3; 5 x 20,000 m3
Bonded storageNone
Receiving capacity1080 (10,000 t/y)
Gas send-out tariffRMB 0.20/m3
Liquid truck-out tariffRMB 0.20/m3
ShareholdersSinopec Natural Gas Co., Ltd. 98%, Binhai Investment (Tianjin) 2%
Commissioned2018
2024 imports459 (10,000 t)

Overview

Sinopec's Tianjin LNG terminal has annual receiving capacity of 1080 (10,000 t/y). In November 2023, the phase II expansion entered operation. Built with domestic technology, phase II added five 220,000 m3 tanks and lifted total gas storage capacity to 1.08 bcm.

Compared with phase I, peak-shaving capability increased by 45%, enough to meet one month of winter gas demand for 72 million households.

Sinopec Tianjin LNG

References

1. Sinopec Tianjin LNG terminal cumulative discharge exceeds 40 million tonnes